Lab · Review · Construction · 10 Nov 2026 · 7 min read

Follow the construction dollar. Data centers went from $8.5 billion a year to $66.7 billion; hotels and offices for people built less.

Private construction in the United States runs at about $1.6 trillion a year. We split it into 14 building types and set the last 12 months against 2019. The money moved toward buildings that hold machines: data centers, power and factories. Hotels and ordinary offices took less than in 2019, in dollars, before any price rise.

A black-and-white photograph of a building
Data center construction, annual rate, September 2026Найдено
$96.5 billion
$8.5 billion a year in 2019; 2 times the rest of office construction today
U.S. Census Bureau, construction spending ·
Photo: Sehjad Khoja / Pexels
The argument in one paragraph

In the to September 2026 private builders put into data centers, the 2019 rate, and in September the annual rate reached a record . Power is at a record too, . Factories are above 2019 but under their September 2024 peak. Hotels and offices other than data centers are the two types that took fewer dollars than in 2019: и less, while the prices of goods that go into a building rose . Data centers, power and factories took of private construction in 2019 and now.

Part 1 · More or less building

Four of 14 building types grew faster than the prices of what they are built from. Two shrank in dollars.

Это counts the value of construction put in place every month and splits it by type of building. We took private types, from new single-family homes to data centers, and set the average of the last , October 2025 to September against the average of 2019. Private construction as a whole went from a year to , more.

A dollar of 2026 does not buy what a dollar of 2019 bought. The producer price index for the goods that go into nonresidential construction rose over the same span. So we draw a line at that rise. A type above it put in more than its price rise; a type below it spent more dollars on what may be the same or less building.

Four types are above the line: data centers , manufacturing , health care and warehouses . Eight are below it, from к , among them new homes, apartments, stores and power. Two took fewer dollars than in 2019: lodging less and offices other than data centers за вычетом.

Tap a band to see its types and what each spent in 2019 and in the last .

Fourteen building types in three bands, last 12 months against 2019Tap a bar
Up more than input prices (+48.9 %)
4 types

Data centers: $8.5 billion a year in 2019, $66.7 billion in the last 12 months, +687.4 %. Manufacturing: $80.6 billion a year in 2019, $178.1 billion in the last 12 months, +121.0 %. Health care: $36.8 billion a year in 2019, $57.3 billion in the last 12 months, +55.8 %. Warehouses: $34.7 billion a year in 2019, $53.8 billion in the last 12 months, +54.8 %.

Value of private construction put in place, seasonally adjusted annual rate, average of October 2025 to September 2026 against the 2019 average; the line is the rise in the producer price index for goods inputs to nonresidential construction over the same months; calculated by Реалист.

The line is a yardstick, not a deflator. The index covers goods only, steel, concrete, lumber, wiring and the like, not labor, land or fees, so it can overstate the price rise of a whole building, and it is one index for every type. A type that sits a few points under the line, power at or new homes at , may well have built about as much as in 2019. A type far under it, or below zero, did not.

Nor is a band a verdict on the next year. Warehouses are above the line on the -month average, yet September 2026 is under their April 2023 peak. The ranking in Part adds the last year and the distance from the peak.

The bands answer one question. The ranking asks four more.

Part 2 · The ranking

Data centers and power set records in September. Factories are a third under their peak.

Это -month average hides the turn. Take September 2026 against September 2025. Data centers are up and power . Manufacturing is down , the largest fall of the . Of the types, are higher than a year ago and lower; private construction as a whole is lower.

Only two types are at the highest monthly reading of their series: data centers, whose series begins in January and power, from January 1993. Manufacturing peaked at in September 2024 and is at , under. Inside it, plants for computers, electronics and electrical equipment peaked at in June 2024 and are at , under; in 2019 they were a year.

The share view shows where the dollar went. Data centers went from of private construction in 2019 to , the largest gain of the and manufacturing from к . The largest losses of share are other offices, к , new single-family homes, к , and lodging, к . Switch the views to see all five measures.

Fourteen building types, five viewsPick a view, tap a bar
Дата-центры
+687.4 % last 12 months against the 2019 average

Data centers (Office: data center): $8.5 billion a year in 2019 and $66.7 billion in the last 12 months, +687.4 %. September 2026: $96.5 billion, +90.3 % on September 2025. Share of private construction 0.81 % in 2019, 4.03 % now. The highest month of the series, from January 2014, is September 2026 at $96.5 billion; September 2026 is that month.

Fourteen building types: value of private construction put in place, seasonally adjusted annual rate, against 2019, September 2025 and the highest month of each series, and as a share of private construction; calculated by Реалист.

Inside office, the mix has turned over. In 2019 data centers were of office construction; in September 2026 they are . Office construction as Census counts it is at a record, a year in September 2026; that is right in dollars and misleading about offices: the rest of office is under its February 2020 peak.

What it means for a lender or an investor. A construction pipeline is not one market. A loan book that leans on warehouse or factory construction faces a smaller pipeline than in 2024; a market whose new space is mostly data centers and power has demand tied to a few large tenants and to the power grid, not to office leasing. Both read the same total. The check is by type and by month, not by the headline.

The ranking shows where each type stands. The paths show how it got there.

Part 3 · The path

Factories rose and turned in 2024. Data centers have not turned.

The chart sets each type at for its 2019 average and follows the monthly annual rate from January 2019 to September , on a log scale so that a doubling looks the same at any level. Data centers end at , more than eleven times their 2019 rate. Manufacturing climbed to in September 2024 and is at .

Most other types sit between и . Lodging fell to in October 2021 and has not come back: it ends at . Other offices end at .

Pick a type to bring its line forward against the grey of the other . The shape to look for is the turn: a type that rose and rolled over has a smaller pipeline coming than its -month average suggests.

Monthly construction spending, 2019 average = 100, to September 2026Pick a type
50100200400800160020192020202120222023202420252026
Дата-центры
1138.3 in September 2026

Data centers: 2019 average = 100, the dashed line. Since January 2019 the monthly rate was as low as 90.2 in March 2019 and as high as 1138.3 in September 2026; it is 1138.3 now, the highest month of its series.

Value of private construction put in place, seasonally adjusted annual rate, each type rebased to 100 at its 2019 average; log scale; calculated by Реалист.

For an underwriter the path is the point. A development or a construction loan sized on the spending of 2023 or 2024 for its type may be priced against a market that has since cooled; one sized in 2021 for a data center is now in a market several times larger. The September reading is preliminary and Census revises the last months, so read the last point as a first estimate.

Что с этим делать

If you lend on, build or buy commercial property: read a construction pipeline by building type and by month, not by the total. The same national figure hides a record in data centers and power and a turn in factories and warehouses.

Реалист reads the files of a property deal or a construction loan, the offering memorandum, the budget, the rent roll and the operating statement, and returns the issues and the questions for the sponsor. The review can set a deal against the construction spending of its type, so the check is the same for the 200th deal as for the first.

Источники

Found: from a dated document. Derived: calculated by us from found figures. Estimate: our judgment, with the method.

  • НайденоValue of private construction put in place, by type, seasonally adjusted annual rate, January 1993 to September 2026. U.S. Census Bureau, Construction Spending, release of 2 Nov 2026, table of private construction, seasonally adjusted. Read 10 Nov 2026. document ↗
  • НайденоWhat each type of construction includes. U.S. Census Bureau, Construction Spending, definitions of construction types. Read 10 Nov 2026. document ↗
  • НайденоProducer price index, net inputs to other nonresidential construction, goods (WPUIP2312301). U.S. Bureau of Labor Statistics, via FRED, Federal Reserve Bank of St. Louis. Read 10 Nov 2026. document ↗
  • ВыведеноLast 12 months against 2019, 14 building types. Реалист calculation from card F1.
  • ВыведеноSeptember 2026 against September 2025, 14 building types. Реалист calculation from card F1.
  • ВыведеноShare of private construction, 2019 and the last 12 months. Реалист calculation from card F1.
  • ВыведеноPeak month and distance from the peak, 14 building types; the paths. Реалист calculation from card F1.
  • ВыведеноThe input price line and the three bands. Реалист calculation from cards F1 and F3.
  • EstimateHow we read the table, and what it leaves out. Реалист estimate. Ask us for the working: alexgalt@titleman.ai.
  • EstimateWhy the line is the price of goods inputs. Реалист estimate. Ask us for the working: alexgalt@titleman.ai.
  • EstimateWhat we did not test. Реалист estimate. Ask us for the working: alexgalt@titleman.ai.

Figures are Реалист calculations from the U.S. Census Bureau table of the value of private construction put in place, seasonally adjusted annual rate, released 2 Nov 2026 (September 2026 preliminary, July and August revised), and from the producer price index for net inputs to other nonresidential construction, goods, as read from FRED, Federal Reserve Bank of St. Louis, on 10 Nov 2026. Dollars are current dollars. Residential improvements and religious buildings are left out; the 14 types do not add up to the total. This is research, not investment advice.